Provisional Sums Explained: What They Mean on a Building Quote

A provisional sum is an allowance for work that can't be priced yet. Used well, it makes a quote more honest. Here is how to read one and what to ask.

The short version

A provisional sum is an allowance for work nobody can price yet. Set realistically and settled openly, it makes a quote more honest, not less.

Some parts of a building job can't be priced accurately until the work starts. Nobody knows the condition of timber under a roof covering until the covering comes off, or exactly what is behind a wall until it is opened up. Rather than guess, a contractor can include a provisional sum: a stated allowance for that part of the work, to be adjusted to the real cost once it is known.

That means the figure on your quote for that item is an estimate, not a fixed price. The final amount can come in below the allowance or above it. Everything else on the quote can still be a firm price.

This guide explains what provisional sums are, when they are reasonable, how they should be settled, and how to compare quotes that use them. It sits within our homeowner's guide to building quotes and payments.

The definition

What a provisional sum is, and what it isn't

A provisional sum is a figure included in a quote for work or items that can't be fully defined or priced when the quote is written. It is identified as provisional, so both sides know it will be replaced by the actual cost once the work is done or the item is chosen.

It is different from the rest of the quote. A fixed price for defined work means the contractor carries the risk of it costing more than they expected. A provisional sum puts that part of the risk with you: if the work needs more than the allowance, the cost goes up, and if it needs less, it comes down.

You may also see the term prime cost sum, sometimes shortened to PC sum. It is used in a similar way for items to be bought, such as fittings you haven't chosen yet. The allowance covers the cost of the item, and the contractor's fitting is usually priced separately. The same principle applies: the allowance is adjusted to what you actually choose.

A provisional sum is not a contingency the contractor can spend as they like, and it is not a figure they are entitled to in full regardless of the work. It is a placeholder. Our short answer to what a provisional sum is gives the one-paragraph version.

When they make sense

Six situations where a provisional sum is reasonable

A provisional sum is the right tool when part of the work genuinely can't be known in advance.

Hidden condition

Work whose extent depends on what is found once something is opened up, such as timber, structure or old fixings under an existing surface.

Items not yet chosen

Fittings, finishes or products you haven't selected yet. An allowance lets the quote go ahead while you decide.

Decisions still to be made

Where the design or specification of part of the work isn't settled, a provisional sum can hold its place until it is.

Specialist input needed

Where part of the job depends on advice or a price from someone else, such as an engineer or a specialist supplier, that part may not be priceable yet.

Repairs of unknown extent

Where some repair is likely but the amount can't be judged from a visual inspection, an allowance is fairer than a guess.

Making good after discovery

Where the finishing work depends on what the main work uncovers, it can be sensible to allow for it separately.

What to keep in mind

A provisional sum is an estimate inside a quote. Budget for the possibility that it comes in higher, and treat the total on the quote as the likely cost rather than the certain one. The more of a quote that is provisional, the less certain the total.

Settling the figure

How a provisional sum should be settled

Once the work is done or the item is chosen, the allowance is replaced with the actual cost. How that actual cost is worked out should be agreed before the work starts, not after.

For work. The usual approaches are a rate for the work measured (for example, per length or area), or the time spent at an agreed day rate plus materials at cost or at an agreed markup. Either is fine if it is agreed in advance and recorded.

For items. The allowance is replaced by the price of the item you choose. Ask whether the contractor adds anything for ordering and handling, and if so, how much. It is a legitimate cost, but it should be clear.

Before going over. It is reasonable to ask the contractor to tell you before the cost of a provisional item exceeds the allowance, so you can decide how to proceed rather than learning about it on the final invoice. Agree this at the start and put it in writing.

On the final account. The final invoice should show each provisional sum, the amount it was replaced with and how that amount was arrived at. If the adjustment is a saving, it should come off. Our guide to final payment and snagging covers the end of the job, and invoices and receipts covers what the paperwork should show.

Before you accept

Questions to ask about every provisional sum

Put these to the contractor for each provisional item on the quote. The answers belong in writing.

  1. What exactly does it cover?

    Ask for a plain description of the work or item. A figure with a vague label is hard to hold anyone to later.

  2. How did you arrive at the figure?

    A realistic allowance is based on experience of similar jobs. Ask whether it reflects what is typically needed or the best case.

  3. How will the final cost be worked out?

    By measurement, by time and materials, or by the price of a chosen item. Ask for the rates now.

  4. Will you tell me before it goes over?

    Agree that you'll be told, and given the chance to decide, before the allowance is exceeded.

  5. Does it include VAT?

    Check whether the allowance and the rates include VAT, so the figures line up with the rest of the quote. Our guide to VAT on building work explains why this matters.

  6. Could any of it be fixed now?

    Sometimes a little more investigation, or a decision from you, lets part of a provisional sum become a firm price. It is worth asking.

Realistic or not

Reading a provisional sum

You can't know the final figure in advance, but you can judge whether the allowance is a sensible one.

Signs it is realistic

  • Clearly described and labelled as provisional
  • Similar to the allowance on other quotes
  • The contractor explains how they reached it
  • Rates for adjusting it are stated
  • Only used where the work genuinely is uncertain
  • Small relative to the fixed-price parts

Signs to ask more about

  • Far below other quotes for the same item
  • Covers work that could reasonably be priced now
  • No explanation of how it will be settled
  • No rates for extra work
  • A large share of the quote is provisional
  • Vague descriptions such as "sundries"

Comparing quotes

Comparing quotes that handle uncertainty differently

Contractors deal with uncertain work in different ways. One may include a provisional sum for it. Another may include a fixed price with some allowance built in. A third may say nothing about it at all. The three quotes can't be compared on the headline totals alone.

A provisional sum set low makes the total look better while leaving the real cost for later. That is one of the most common reasons the cheapest quote can cost more. It isn't necessarily deliberate: a contractor may simply have assumed the best case.

To compare fairly, ask each contractor what they expect to uncover and what it would cost, and put that figure into every quote. If one contractor has priced a piece of work as fixed and another has left it provisional, the fixed price carries more certainty, and that is worth something. Our guide to comparing building quotes covers the full method.

It also helps to understand the difference between an estimate and a quote. A quote with a few clear provisional sums is mostly a firm price. A document where most figures are provisional is closer to an estimate, and should be treated as one.

When the figure changes

What happens when a provisional sum is adjusted

When the uncertain work is uncovered, the contractor should tell you what they have found and what it means for the cost. This is the moment to ask questions: what is needed, why, and what the options are, if there are any.

An adjustment to a provisional sum is not the same as a change to the job. The work was always in the quote; only its cost was uncertain. A change to what you have asked for is a variation, and it is handled differently. Our guide to variations and extra costs explains the distinction.

Keep a note of each adjustment as it happens: what was found, what was agreed and the revised figure. Photographs of the uncovered condition are useful too. It makes the final account straightforward to check, and it avoids any debate about what was agreed. Our answer on what happens if the price goes up covers the wider question.

A row of pitched rooftops at golden hour.

How Mortaro handles questions

Your quotation explained, before you decide

Mortaro coordinates domestic building work, carried out by an independent main contractor from our network. Your contractor visits, prices the work at trade rates and sets the scope, and we prepare it as a clear written quotation that names them as your main contractor.

If any item on your quotation is unclear, including anything that depends on what is found once work starts, ask us. We put the question to your contractor and come back to you with the answer, so you understand what you are agreeing to. The quotation is valid for 30 days, which leaves time to ask.

How quotations work explains the process from site visit to decision.

Straight answers

Questions about provisional sums

Do I have to pay the full provisional sum?

No. A provisional sum is replaced by the actual cost of the work or item. If that cost is lower, you pay less. If it is higher, you pay more, which is why it helps to agree the rates and ask to be told before the allowance is exceeded.

Is a quote with provisional sums a bad sign?

Not at all. Where part of the work genuinely can't be priced in advance, a clearly stated provisional sum is more honest than a guess. The things to watch are allowances that look too low and work left provisional that could be priced now.

What is the difference between a provisional sum and a PC sum?

Both are allowances. A provisional sum usually covers work that can't yet be defined. A prime cost (PC) sum usually covers an item still to be chosen, such as a fitting, with the fitting work priced separately.

Can I ask for a provisional sum to be made a fixed price?

You can ask. Sometimes a little more investigation, or a decision on your part, allows the contractor to fix the price. Where the work genuinely can't be seen until it starts, a fixed price may simply build in a margin for the unknown.