Retention on Building Work: A Homeowner’s Guide
What a retention is, when it makes sense on a home project, and how to agree one fairly before the work starts.
The short answer
A retention is a small part of the price held back for an agreed period after the work is finished. It works well when both sides agree it in writing before the job starts.
With a retention, the customer keeps back an agreed part of the contract price when the work is completed, then releases it at the end of a set period once any defects that have appeared are put right. The money gives the contractor a clear reason to come back, and gives the customer something in hand while the new work settles in.
Retentions are a normal feature of larger commercial building contracts. On domestic work, such as a roof repair, a rooflight or a modest extension, they are much less common. They can still be a sensible arrangement on a bigger home project, provided they are agreed at the start and written into the quote or contract.
This guide explains how a retention works, when it is worth asking for, how to agree one fairly, and what else can do the same job on a smaller project. It sits within our wider guide to building quotes and payments.
How it works
A retention from start to finish
Every stage depends on what was agreed at the beginning. That is the single most important thing to understand about retention.
It is agreed before work starts
The quote or contract states the amount to be held back, how long it will be held, and what has to happen before it is released. Both sides know the terms before anyone commits.
It is held back at completion
When the work is finished, you pay the final balance less the agreed retention. Everything else that is due is paid as normal, on time.
The defects period runs
For the agreed period, the contractor comes back to put right any defects in their work that show up. You report them in writing as they appear, with photographs.
It is released at the end
Once the period has ended and any reported defects have been dealt with, you pay the retention. Some contracts release part of it at completion and the rest at the end of the period.
Easy to mix up
What a retention is, and what it sits alongside
Three arrangements often get called retention. Only one of them is.
A retention
An agreed sum held back after the work is complete, for an agreed period, to cover defects that appear later. It is part of the deal from day one, and the contractor prices the job knowing about it.
Holding back for unfinished items
Keeping back a fair amount because something in the quote has not been done yet is a different thing. That money is for work still to come, and it is paid when the work is finished. Our guide to final payment and snagging covers it.
A workmanship warranty
The contractor's written promise to put right defects in their work for a stated period. It usually runs well beyond a typical retention period, and it involves no money being held back at all.
On a home project
When a retention makes sense for a homeowner
The case for a retention grows with the size and length of the job. On a larger project, such as an extension or a whole-house refurbishment, some defects only show themselves after a season or two: a crack as new plaster dries out, a door that sticks once the heating is on, a gutter joint that drips in the first heavy rain. A retention gives both sides a simple, agreed way of dealing with those.
On a small job the picture changes. If the whole job is a roof repair or a single rooflight, the amount held back would be small, and the paperwork and chasing involved can outweigh the benefit. A clear written warranty, from a contractor you have checked properly, usually does the same job with far less friction.
It also matters how the rest of the payment schedule is set up. If you are paying in stages as the work progresses, each payment is already tied to work you can see. A retention sits at the very end of that schedule, after the final payment.
The contractor will factor a retention into their price and cash flow. Waiting months for part of the money is a real cost to a small firm, so a fair retention is proportionate to the job and the risk, not the largest sum you can negotiate.
Worth it or not
Where a retention earns its place
A rough guide. Every project is different, and the contractor's own terms matter as much as the size of the job.
Worth discussing
- An extension or other large, multi-stage project
- Work that will run over several months
- New structures where settling and drying out are expected
- A written building contract with a defects period
- Work where problems may only show after a full season
Usually not needed
- A repair or small, single-visit job
- Work covered by a clear written warranty
- Jobs where the final payment is already on completion
- Quotes where the payment terms are simple and agreed
- Situations where you would be adding it after the event
Getting it right
How to agree a retention fairly
Raise it at quote stage. Ask for the retention before you accept, so the contractor can price it and include it in their terms. Our guide on what to do before accepting a quote covers the other things worth settling at the same point.
State the amount plainly. Write it as a sum of money, or as a clearly stated share of the final price, so there is no argument about the figure later.
Set the period. Agree how long it will be held, and from when. Completion is the usual starting point, so it helps to agree what completion means for your job.
Say what releases it. For example: the end of the period, plus any defects reported in writing during it having been put right. The clearer the trigger, the easier the release.
Agree what happens if defects are not dealt with. A contract can say that the retention may be put towards the cost of having reported defects put right by someone else. If that is the intention, it should be written down.
Keep it in writing. The retention should appear in the accepted quote or the contract, and on the final invoice, so everyone can see what has been held back and why. Our guide to what a building quote should include sets out where payment terms normally sit.
The Housing Grants, Construction and Regeneration Act 1996, often called the Construction Act, sets payment rules for much commercial building work. It generally excludes contracts with a homeowner for work on the home they live in, so a domestic retention depends on what you and the contractor agreed. Separately, the Consumer Rights Act 2015 requires a trader to carry out a service with reasonable care and skill. GOV.UK and Citizens Advice both publish guidance. This is general information, not legal advice.
Closing it out
Releasing a retention without fuss
A retention works best when its release is treated as a normal, planned payment rather than a favour. Put the release date in your diary when the work is completed, and a week or two before it arrives, check whether anything has appeared that needs reporting.
If defects have come up during the period, report them in writing as soon as you notice them, with photographs and a short description of where they are. Waiting until the last day and presenting a long list tends to sour things. Reporting as you go gives the contractor a fair chance to deal with each item while it is small.
Once the period has ended and any reported items have been put right, pay the retention promptly and keep a record of the payment alongside the final invoice. Our guide to invoices and receipts for building work covers what to keep and why it is useful for years afterwards.
On a project paid in stages, the retention is simply the last line of the schedule. Staged payments explained shows how the earlier payments fit together, so the retention does not come as a surprise to either side.
At the end of the job
Holding money back without an agreed retention
If no retention was agreed, you cannot fairly create one at the end by keeping part of the final payment in case something goes wrong later. The contractor priced the job on the payment terms you accepted, and changing them after the work is done is the quickest route to a dispute.
That is different from a situation where something in the quote is unfinished or clearly not right when the work is handed over. Then it is usually reasonable to pay for what has been done and keep back an amount that fairly reflects what is outstanding, telling the contractor in writing exactly what it relates to. Once those items are complete, the rest is paid.
A clear snagging list, agreed with the contractor at the end of the job, keeps that conversation specific. Vague dissatisfaction is hard to resolve. A list of named items with photographs usually gets dealt with quickly.
Working with Mortaro
How payments are set out in a Mortaro quotation
Mortaro coordinates domestic building projects. Your quotation names the appointed main contractor, an independent company from our network who carries out the work, holds the insurance and provides the workmanship warranty. Your construction contract is with them.
The payment terms are a 25% deposit to secure the works and the balance on completion. Both payments are made to your contractor, and we receive them as the contractor's payment administration agent and pass them on without unnecessary delay. A retention is not part of that structure.
Defects that appear after completion are covered by your contractor's workmanship warranty: a minimum of 12 months across our network, usually from completion, and often longer on larger works, with the exact terms confirmed in your quotation. If something needs putting right, tell us and we raise it with your contractor and follow it up. Payments explained and putting things right set out both in full.
Straight answers
Questions about retention
Is retention normal on domestic building work?
It is much more common on commercial contracts than on home projects. On a larger domestic job it can be a reasonable thing to agree, but it needs to be written into the quote or contract before work starts. Our short answer on what retention in building means covers the basics.
Can I hold back a retention if it wasn't agreed?
Not fairly. If the payment terms you accepted say the balance is due on completion, holding back extra money in case of future problems changes the deal after the event. If specific work is unfinished or not right at handover, that is a separate matter and can be dealt with item by item.
How long is a retention usually held?
For whatever period the contract states. The aim is a period long enough for defects to show, such as through a winter or a full heating season on a larger project. Agree the period and its start date in writing.
Is a retention better than a warranty?
They do different jobs. A retention gives you money in hand for a short period. A written workmanship warranty from a properly checked contractor usually runs for longer and needs no money held back. On small jobs the warranty is often enough on its own.
Will asking for a retention put the price up?
It can. Waiting months for part of the payment is a cost to the contractor, and some will reflect it in their price or prefer not to agree one on a smaller job. That is a fair commercial point, not a warning sign. Discuss it openly at quote stage.
Start here
Tell us about the work you have in mind
We will confirm we cover your postcode, arrange a site visit with a contractor from our network and send you a written quotation. No charge, no obligation.