Does a Building Quote Include Waste Removal?
Not automatically. A good quote states who takes the waste away, how, and whether it is in the price. Here is what to look for.
The short answer
Not automatically. A good quote says who clears the waste and whether it is in the price.
A building quote does not automatically include waste removal. Many do, but some leave it out, or include clearing the site while leaving you to arrange a skip. The quote should state who is responsible for taking the waste away, how it will be done and whether the cost is included. If it doesn't say, ask before you accept. Asking takes a moment and avoids a surprise cost at the end.
It matters for more than tidiness. Waste can be a real cost on a building job, and as a householder you have a responsibility to make sure it ends up with someone authorised to take it.
How it is usually handled
Three common ways waste leaves site
A skip
Hired by the contractor or by you. If it goes on the road, a permit from the council is normally needed, usually arranged by the skip firm.
The contractor takes it
On smaller jobs, the contractor may load the waste and take it away themselves as they go or at the end.
A collection service
A grab lorry, bags or a waste collection firm, arranged by the contractor or by you.
Your responsibility
Check the waste goes to someone authorised
Householders have a legal duty of care to take reasonable steps to make sure their waste is passed to a business authorised to carry it. In practice, that means checking that whoever takes it away is a registered waste carrier. You can check a business on the public register: GOV.UK for England, Natural Resources Wales, SEPA in Scotland and NIEA in Northern Ireland. Be cautious about unsolicited offers to take waste away cheaply, and check the registration first.
If your contractor is removing the waste, it is reasonable to ask for their waste carrier registration. A reputable contractor will be used to the question. This is general information, not legal advice.
Reading the quote
Wording to look for
Clear
- "All waste removed from site on completion"
- "Skip hire included"
- "Site left clean and tidy"
- A separate line with a figure for waste
Worth a question
- No mention of waste at all
- "Skip by client"
- "Clear site" with no detail
- Waste listed as an extra with no figure
Comparing quotes
Waste is part of a like-for-like comparison
When you compare quotes, check each one handles waste the same way. A quote that leaves you to hire a skip is not really cheaper if you then pay for the skip. How do I compare quotes fairly? and what a building quote should include cover the other items to line up, and should scaffolding be on the quote? deals with the other common omission.
Before work starts
Five waste questions to settle early
Where will a skip go?
On your drive, or on the road with a permit. A skip on a drive can mark it, so ask about protecting the surface.
How often will it be emptied?
On longer jobs, a full skip that sits for days is a nuisance. Ask how exchanges are handled.
What about reusable materials?
If you want to keep anything, such as sound bricks or timber, say so before work starts.
Are there any special materials?
Some materials, such as asbestos, must be handled by specialists under separate rules. If there is any chance it is present, it should be identified and priced separately.
What does "clear" mean at the end?
Agree whether that means all waste gone, surfaces swept, and the garden and drive free of debris.
At the finish
What a cleared site looks like
At the end of the job there should be no waste, offcuts or packaging left behind, unless you agreed to keep something. Checking this is part of the final walk round, and it is one of the things to look at before paying the balance. What does payment on completion mean? covers the rest of that check.
If waste costs were left out of one quote and included in another, it helps explain why the two prices differ. Why are building quotes so different? covers the other common reasons, and the quotes and payments guide brings them together.
With Mortaro
Waste removed on completion
On projects Mortaro coordinates, waste is removed on completion. If you have a question about how it will be handled on your job, such as where a skip would go, ask us and we will confirm the details with your contractor. How it works sets out each stage from first call to completion.
Straight answers
Questions about waste
Can I put building waste in my household bin?
Generally not. Household collections are not intended for building waste, and many council tips have their own rules for it. Check with your local council.
Who pays for a skip permit?
Whoever the quote says is arranging the skip. Skip firms often apply for the permit and include it in their charge, so ask.
Should I keep any paperwork for waste?
If you arrange waste removal yourself, keep a note of who took it, their registration details and any receipt. It shows you took reasonable steps.