Should Scaffolding Be on the Quote?

If the job needs scaffolding, the quote should say so clearly: whether it is included, for how long, and who deals with any permissions.

The short answer

If the job needs it, the quote should say so, and say exactly what is covered.

Yes. If the work needs scaffolding or other access equipment, the quote should make clear whether it is included in the price or charged separately, how long it is allowed for, and who is arranging it. It doesn't always have to be a separate line, but it should never be a surprise. Asking about it before you accept costs nothing and avoids a common cause of unexpected bills.

Access can be a significant part of the cost of work at height, and it is a common reason two quotes for the same job look so different. A quote that leaves it out may simply be cheaper on paper. The quotes and payments guide covers the other items that commonly cause price differences.

What the quote should show

Six scaffolding details worth confirming

Included or extra

Is scaffolding in the price, a separate figure, or something you are expected to arrange?

The hire period

How long is it allowed for, and what happens to the cost if the job runs longer?

What it covers

Which elevations or areas it will reach, and whether it covers everything the work needs.

Who puts it up

Whether the contractor erects it or uses a scaffolding firm, and who is responsible for it on site.

Permissions

Who deals with a licence if it goes on the pavement, or with a neighbour if it needs their land.

Alternatives

On some jobs a tower or other access is enough. Ask what is proposed and why.

Permissions

Pavements, roads and neighbours

If scaffolding needs to stand on a pavement or road, a licence from the local council is normally required, and the scaffolding firm usually applies for it. Check the quote says who is responsible, and allow time for it before the start date. Your local council publishes its own process.

If the scaffolding needs to go on or over a neighbour's land, you will need their agreement first. Talk to them early. It is a far easier conversation well before the start date than on the morning the lorry arrives. This is general information, not legal advice. If you live in a flat or a shared building, scaffolding may also need the agreement of the freeholder or managing agent.

Comparing quotes

Scaffolding and the true price

When you compare quotes, check each one treats access the same way. If one includes full scaffolding and another assumes ladders or leaves it for you to arrange, the prices are not comparable yet. How do I compare quotes fairly? explains how to line them up, and why are building quotes so different? covers the other usual causes. It is also worth checking whether the figure covers putting the scaffolding up and taking it down as well as the hire, and any extra protection the job needs.

For the other items a quote should list, see what a building quote should include and, for work at height specifically, what should a roofing quote include?

While it is up

Practical points to agree in advance

None of these needs to be complicated. A short conversation before the start date covers most of them.

  1. Access to the house

    Where the scaffolding will stand, and how you will get in and out of doors, gates and the driveway.

  2. Your neighbours

    Let them know when it is going up and coming down, especially if it will be close to their boundary.

  3. Security

    Ask how access to the scaffolding is controlled outside working hours, and keep upstairs windows locked while it is up.

  4. Gardens and surfaces

    Mention anything that needs protecting, such as planting, paving or a conservatory roof.

  5. Coming down

    Agree when it will be removed once the work is finished, so hire does not run on. If costs change, what happens if the price goes up? explains your position.

With Mortaro

Ask us, and we confirm it

On a Mortaro quotation, the work and the price are set by your contractor after the site visit, when they have seen what access the job needs. If your quotation doesn't make the scaffolding position clear to you, ask us before you accept and we will confirm it with your contractor in writing.

The quotation is valid for 30 days, so there is time to get every question answered first. How quotations work sets out what it includes.

Straight answers

Questions about scaffolding

Can I arrange my own scaffolding to save money?

Sometimes, but the contractor needs to agree it suits the work, and you take on arranging it. Many contractors prefer to use their own access so they know it is right for the job.

Who pays if the scaffolding is up longer than planned?

That depends on your quote and the reason for the delay. Agree it at the start by asking how the hire period is allowed for.

Is scaffolding always needed for work at height?

Not always. It depends on the job, the height and the access. The contractor decides after seeing the site, and it is reasonable to ask why they chose what they did.