What Should a Roofing Quote Include?

A good roofing quote leaves you in no doubt about what is being done, with what, for how much and by whom. Here is what to look for.

The short answer

Everything you are paying for, written down before you agree.

A roofing quote should set out in writing which parts of the roof are being worked on and what is being done to them, the materials to be used, how access will be provided (including any scaffolding), whether waste removal and making good are included, the total price and whether it includes VAT, the payment terms, the workmanship warranty and the name of the business doing the work. If something isn't written down, treat it as not included until the contractor confirms otherwise.

Roofing quotes vary a great deal in how much detail they give. That doesn't always mean one is better than another, but a quote you can check line by line is much easier to rely on. The general rules are in what a building quote should include; this page covers the points that matter most on a roof.

The checklist

What a clear roofing quote covers

The scope of work

Which roof or part of the roof, and whether it is a repair, a partial replacement or a full replacement. Related items such as guttering, fascias, flashings or chimney work should be listed if they are included.

The materials

What the roof will be covered with and what goes underneath where that is being replaced. If you have asked for a particular product or finish, the quote should say so.

Access and scaffolding

Whether scaffolding or other access equipment is included in the price, for how long, and who arranges any permission needed if it has to stand on a pavement or road.

Waste and making good

Whether old materials are taken away and the site left tidy, and whether any disturbed areas are made good afterwards.

Price, VAT and payment

The total, whether it includes VAT, the deposit if there is one, and when the rest is due. Any provisional sums should be clearly marked as allowances.

Warranty and who does it

The workmanship warranty, how long it runs and from when, and the name of the business that will carry out the work and give that warranty.

The grey areas

What roofing quotes often leave open

What's under the surface. On many roofs the condition of the timbers or deck underneath can't be fully seen until the old covering is off. A good quote says how that will be handled if something needs attention: a provisional sum, a stated rate, or a promise to stop and agree a price with you first. See what a provisional sum is.

Scaffolding. It can be a significant part of the cost, so it is worth being certain it is in the figure. Our answer on whether scaffolding should be on the quote goes into more detail.

Waste. Stripped roofing material is bulky. Confirm whether removal is included; does a quote include waste removal? explains what to ask.

Regulations. Some roofing work falls under the Building Regulations. Ask whether yours does and who will deal with any notification. The Planning Portal publishes general guidance for homeowners.

Weather. Roofing depends on it. It helps to know how the contractor keeps the roof weathertight if work is paused and how a delay affects the start date.

A simple test

Read the quote as if you had never met the contractor. Could you say exactly what you will have at the end, what it will cost and who is responsible for it? If not, write down the gaps and ask before you accept. For questions to raise at the visit itself, see what to ask a roofer before hiring.

The practical side

Details worth agreeing before work starts

Not all of these belong in the price, but they are easier to settle now than on the first morning.

Timing and access

  • An expected start date, or how it will be agreed
  • Roughly how long the work should take
  • Working hours and any access needed inside the house
  • Where scaffolding, skips and materials will go
  • Parking for the contractor's vehicles

Care of your property

  • How gardens, paths and conservatories below will be protected from debris
  • What happens if rain arrives mid-job
  • How the site is left at the end of each day
  • Who to contact with questions while the work is going on

If you use Mortaro

What our quotations set out

Roofing is a large part of the work Mortaro coordinates. After the site visit, your contractor prices the job and we prepare it as a written quotation on our template, naming the appointed main contractor. It sets out the work and the price, the 25% deposit and the balance on completion, and your contractor's warranty terms. It is valid for 30 days, and waste is removed on completion. Anything unclear, ask us. How quotations work has the detail.

Straight answers

Questions about roofing quotes

Should a roofing quote be itemised?

It doesn't have to be priced line by line, but the work should be described clearly enough that you can tell what is and isn't included.

What if the quote just says "re-roof" and a price?

Ask for the detail in writing: which areas, which materials, and what is included for access and waste. A contractor who knows the job can usually add this quickly.

Should the quote say how long the warranty lasts?

Yes. The workmanship warranty should be stated in writing, including how long it runs and from when. Material warranties from manufacturers are separate and may also be mentioned.